Project | Client | Location | Period | Scope |
---|---|---|---|---|
ADR Closure Project Package-I (Decommissioning & Making Hydrocarbon Free) | ADNOC Refining | UAE | Sep 2022 - May 2023 | Decommissioning |
Provision of Plant Shutdown Activities at NEB & SE Fields | ADNOC Onshore | UAE | Jul 2022 - Jul 2025 | Shutdown |
Repair of Defective Roof Drain System in Gas Oil Tank 6 and ULG 98 Tank 8 & LT Repair in Tank 4 in Ruwais Depot | ADNOC Distribution | UAE | Apr 2022 - May 2022 | Integrity Repair |
Welding Repair Activities during H1 S/D in Dec. 2021 (29 Jobs) | ADNOC Gas Processing | UAE | 01/12/2021 | Piping Work |
Metallurgy Upgrade | ADNOC | Abu Dhabi, UAE | Oct 2021 - Dec 2021 | Piping Work |
SK, M-2 Project | ADNOC | Abu Dhabi, UAE | Jan 2021 - Dec 2021 | Resource Rental Services |
Year 2021 Asab 2 Shutdown | ADNOC Gas Processing | UAE | 2021 | Shutdown |
CCTV Relocation | CRCC – GTGC JV | UAE | 2021 | Modification |
ESD Valve Replacement | ADNOC Distribution | UAE | 2021 | Integrity Repair |
Replacement of Tank Roof Drain System | ADNOC Distribution | UAE | 2021 | Integrity Repair |
Filter C Installation | Daewoo E&C / ADNOC Refining | UAE | 2020 | Integrity Repair |
Turnaround 2020 | Petro Rabigh | Rabigh, Saudi Arabia | Mar 2020 Apr 2020 (S/D) | Turnaround |
Habshan Turnaround | ADNOC | UAE | Jan 2020 Mar 2020 (S/D) | Turnaround |
RRE Maintenance | ADNOC | UAE | 2020 | Maintenance |
BLNGIT Project | Bahrain LNG WLL | Bahrain | 2017-2019 | Topside Jetty Area (SMP, Spool Fab., E&I) |
RRW O&M | ADNOC | UAE | 2019 | O&M |
Clean Fuels Project | KNPC | Kuwait | 2017-2019 | SMP, Spool Fab, Repair |
RRW Restoration | ADNOC | UAE | 2018-2019 | SMP, Spool Fab, Repair |